As announced in March 2022, a lead gift from Peter Gummeson ‘80 is the catalyst to create Gummeson Grounds: Home of Mike Bourger ’44 Field at Oaks Stadium, and is contingent on additional fundraising. The proposed project will include updated roof covered seating, English-style terraces that run behind the goals and along the sidelines, and an irrigation system for an immaculate playing surface. The anticipated timeline is for construction to commence spring 2023 and open for the fall 2023 soccer season.