Quad with Hogg Hall

Quad with Hogg Hall

Progress – Crews are working on the southern paths for the project between Farinon and Skillman Library.  A separate crew is setting the granite pavers in the new Clinton Terrace turnaround.  Early next week the hardscape contractor will start setting the remaining asphalt block in the circle between the granite pavers on the inside and outside of the turnaround.

The Quad

The Quad

South College Drive – A new concrete curb will be installed along South College Drive tomorrow between Skillman Library and Colton Chapel.  We ask that drivers slow down around the Van Wickle curve as construction crews are along the roadway performing the installation.

Major Deliveries – We’re anticipating a large concrete pour on Friday along with an increase in construction traffic along High Street.

Clinton Terrace – Clinton Terrace is only open for deliveries to the Farinon Center.

Concrete curb

Concrete curb

East Campus Lane – East Campus Lane is open for members of Zeta Psi Fraternity, along with faculty and staff who have assigned spots.